AboutEst. 2004Lagos, NG · 6.5°N 3.4°E

Two decades of critical power.

From a single Lagos workshop to a regional force in power infrastructure — built on engineering discipline and measured in uptime.

Voltaic Industries manufacturing facility in a Lagos industrial estate at dusk
Our story

Founded to make power dependable.

Voltaic was founded in 2004 by a group of engineers frustrated by unreliable grid power holding back Nigerian industry. Two decades on, we design, build and maintain the systems that keep telecom networks, factories and hospitals running.

  • 160+ engineers & technicians
  • ISO 9001 & 45001 certified
  • Siemens-licensed manufacturer
Workers on the switchgear assembly floor at Voltaic Industries, Nigeria
BLCK. 02History

Milestones.

2004

Founded in Lagos

A workshop building distribution boards for local industry.

2009

Siemens licence

Licensed to manufacture SIVACON-class switchgear locally.

2014

100 staff

Expanded into telecom-tower power and field services.

2019

3,000 sites

National hybrid-power programme reaches scale.

2023

Storage division

Launched battery energy storage (BESS) line.

2026

Regional expansion

Offices in Port Harcourt, Abuja and Kano.

BLCK. 03Metrics

By the numbers

20+
Years
160+
People
3,400+
Sites
11
States
BLCK. 04Leadership

Leadership.

Ada Okafor, Chief Executive Officer of Voltaic Industries

Ada Okafor

Chief Executive Officer
Tunde Bello, Chief Operating Officer of Voltaic Industries

Tunde Bello

Chief Operating Officer
Ngozi Eze, Head of Engineering at Voltaic Industries

Ngozi Eze

Head of Engineering
Ibrahim Sani, Head of Manufacturing at Voltaic Industries

Ibrahim Sani

Head of Manufacturing

Work with an engineering-led partner.

Whether it is a single substation or a national rollout, we bring the same discipline.